Engineering Consultant Invoice Template

Free invoice templates for engineering consultants built for billable hours, milestone payments, and travel expenses. Download and edit in PDF, Word, Excel, Google Docs, or Google Sheets.

Also called: engineering consultant invoice, engineering consultant bill, or consulting engineer invoice.

Download Free Engineering Consultant Invoice Templates

Download a template, then edit in PDF, Word, Excel, Google Docs or Google Sheets. Print or email when ready.

Sheets, Excel, Word and Doc Templates Coming November 21, 2025.

Custom Engineering Consultant Invoice Template

Best for:
Logo, project, PO and permit IDs.

Editable Engineering Consultant Invoice Template

Best for:
Edit scope, revisions, site visits.

Printable Engineering Consultant Invoice Template

Best for:
Totals, dates, approvals, signatures.

Free Engineering Consultant Invoice Template

Best for:
Hours, stamping, calcs, site notes.

How to Invoice as an Engineering Consultant

Keep it phase-based, log everything, and apply retainers so clients see exactly what they’re paying for.
Free Online Invoice Generator
☝️ No sign-in. Save as PDF.
In 5 Steps:
  1. Set scope, phases, and rates in a signed SOW, and collect a retainer if required.
  2. Track billable hours, travel, and reimbursables against the SOW as work happens.
  3. Record approved changes and capture their change-order IDs in your log.
  4. Generate the invoice at a milestone or month end, apply the retainer as a credit, and verify totals.
  5. Send the invoice with payment terms, delivery options, and proof of delivery saved to your files.
Free Online Invoice Generator
☝️ No sign-in. Save as PDF.

What to Include in an Engineering Consultant Invoice

Use these fields so your invoice is clear, traceable, and compliant.
Use these fields so your invoice is clear, traceable, and compliant.
  • Your business name, address, email, and phone
  • Client name and billing address
  • Invoice number and invoice date
  • Project name and project or site address
  • PO or SOW or contract reference
  • Service period start and end dates
  • Professional license # and stamp info (if required; check local rules)
  • Permit or inspection numbers (if applicable; check local rules)
  • Tax ID or VAT number
  • Payment terms, due date, and accepted methods
  • Late fee policy
  • Retainer or deposit received and credits applied

Billing Scenarios for Engineering Consultants

How to label charges so every invoice makes sense the moment your clients see it.

1.
Consulting hours; Travel time
On-site visit with billable travel
This separates work time from getting there so the client sees how the clock ran.
2.
Feasibility study (fixed); Final report
Flat-fee feasibility study
Shows the fixed scope and the deliverable the client receives.
3.
Preliminary design; Final design
Design work billed by phase
Ties payments to clear milestones the client can approve.
4.
Change order #___; Additional hours
Client-approved scope change
Show the retainer as a prior payment credit and net it against current charges. Reconcile the remaining balance on every invoice.
5.
Lab/testing fees; Reimbursable expenses
Third-party testing or permit costs
Keeps pass-through costs separate from your labor.
6.
Emergency call-out; After-hours surcharge
Flags urgent work and the premium the client agreed to.
Flags urgent work and the premium the client agreed to.
Free Online Invoice
No sign-in. Save as PDF.
Create a Free Account
☝️ Risk-free 30-day trial.

Billable services and deliverables for engineering consultants

Itemize hours, milestones, CAD deliverables, and travel with professional invoice line items.

Charge or Service
Unit
Taxable
When to use
How to show it
Site Visit & Field Measurement
Time
Verify conditions on site
Hours × hourly rate. Capture photos, dimensions, and notes to de-risk design changes.
CAD Drafting & 3D Modeling
Time
Turn markups into drawings/models
Hours × hourly rate. Keep files named/versioned so revisions track cleanly.
Structural Load Calculations
Time
Size beams, joists, or connections
Hours × hourly rate. Attach calc sheets to the submittal for reviewer clarity.
PE Stamp & Sealed Drawings
Item
Issue final sealed plans
Each × fixed rate. Confirm scope and jurisdiction requirements before sealing.
Feasibility & Concept Report
Item
Early go/no-go decision
Each × fixed price. Summarize options, constraints, and assumptions to align stakeholders.
Permit Package Preparation
Item
Assemble plans for permitting
Each package × fixed price. Include checklists and forms; permit fees billed separately.
Construction Admin (RFIs)
Time
Answer RFIs or review submittals
Hours × hourly rate. Log responses with dates to maintain a clear audit trail.
As-Built Record Drawings
Item
Document field changes at closeout
Each set × fixed price. Base on contractor redlines and verified site measurements.
Printed Plan Sets
Item
Taxable
Provide hard-copy drawings
Sets × unit rate. Include sheet count and size; shipping billed as pass-through if used.
After-Hours/Rush Service
Time
Nights, weekends, or fast turns
Hours × after-hours rate. Confirm written approval for overtime before starting.
Save and reuse your engineering rates and expenses
Create a free account and save hourly rates, milestone fees, and report charges once, so nothing gets retyped.
Create a Free Account
☝️ Risk-free 30-day trial. No card.

Common Engineering Consultant Invoicing Mistakes

These trip up smart people and slow cash, but each has a simple fix you can apply today.

Mistake
How to fix it
Using vague scope lines that don’t tie to the SOW leads to disputes and slow pay.
Map each line to the SOW section or milestone and use plain deliverable names. Add a short outcome so the client sees value.
Leaving off service dates makes time entries look padded and invites pushback.
Add start and end dates for the work period and reference a timesheet or field log.
Include your license number and stamp when needed and name the responsible engineer. If rules vary, check local rules.
Include your license number and stamp when needed and name the responsible engineer. If rules vary, check local rules.
Show the retainer as a prior payment credit and net it against current charges. Reconcile the remaining balance on every invoice.
Show the retainer as a prior payment credit and net it against current charges. Reconcile the remaining balance on every invoice.
Dropping 'miscellaneous' lump sums without detail looks arbitrary and hurts trust.
Break the amount into clear units like hours, fixed deliverables, or expenses and add one-line descriptions.
Inconsistent invoice numbers or missing the client PO or SOW reference stalls approvals.
Use a consistent numbering scheme and include the client PO and SOW IDs on every invoice to speed routing.

Engineering Consultants Invoice FAQs

Line items for design hours, field work, subconsultants, stamps, and reimbursables. Terms for retainers, milestones, and change orders. Engineering Consultants Invoice Template tips, clear answers.

How do engineers bill differently for design work vs field time?

Most firms price design at a higher rate than site visits due to tools, software, and liability. Split them. Example line items: “Senior Engineer, Design, 12 hrs @ $185 = $2,220” and “Field Verification, 4 hrs @ $140 = $560.”

What belongs on a feasibility study invoice?

List scope, fixed fee or hours, and any reimbursables. Example: “Feasibility Study Lump Sum = $3,500” plus “Records Retrieval, 2 hrs @ $95 = $190” and “Plan Room Copies = $26.”

Can I take a retainer and draw it down on progress bills?

Yes. Show it as a credit until exhausted. Example: “Retainer on Account = -$2,000” with current charges, then “Balance Due This Period = $1,450.”

How should travel, per diem, and mileage be billed?

Bill mileage, per diem meals, lodging, and travel time if your contract allows. Example: “Mileage, 86 mi @ $0.67 = $57.62,” “Per Diem Meals, 2 days @ $55 = $110,” “Travel Time, 1.5 hrs @ $95 = $142.50.”

Should I add a markup on subconsultants like survey or geotech?

Common practice is pass-through plus a management fee. Spell it out in terms. Example: “Geotech Subconsultant Invoice = $2,400” and “Subconsultant Admin Markup 10% = $240.”

When do I charge for PE stamping and sealed drawings?

Charge when you sign and seal, even on small jobs, if it was not included in the base fee. Example: “PE Stamp and Seal, 2 sheets @ $150 = $300.”

How do I handle change orders and out-of-scope RFIs?

Open a new line with clear notes, then price by T&M or agreed lump sum. Example: “Change Order 02, Add Stair Stringer Calc, 3 hrs @ $170 = $510.”

Can I bill for meeting time and city coordination?

Yes, if the agreement lists meetings and agency coordination as billable services. Example: “AHJ Coordination, 1.25 hrs @ $140 = $175” and “Owner Meeting, 1 hr @ $160 = $160.”